Sequence and Queries 21
InterviewTime limit2sMemory limit512 MB
Support range-add updates and point queries on an array of up to 100,000 elements with up to 100,000 operations.
- Level
Medium4 of 10
- Topics
- Array, Prefix sum, Implementation
- Solved
- No attempts yet
Problem
A sequence A1, A2, ..., AN of length N is given. Write a program that performs the following queries.
1 i j k: add k to Ai, Ai+1, ..., Aj.2 x: print Ax.
Input
The first line gives the size of the sequence N (1 ≤ N ≤ 100,000).
The second line gives A1, A2, ..., AN. (1 ≤ Ai ≤ 1,000,000)
The third line gives the number of queries M (1 ≤ M ≤ 100,000).
M lines follow, one query per line. For a type 1 query, 1 ≤ i ≤ j ≤ N and -1,000,000 ≤ k ≤ 1,000,000; for a type 2 query, 1 ≤ x ≤ N. At least one type 2 query is given.
Output
Print a value for each type 2 query.