Time limit3sMemory limit1024 MB

Summary
Given N fixed, non-overlapping meetings in a 1440-minute day and K task durations, decide whether all K tasks can be squeezed into the free gaps.
Level

Medium4 of 10

Topics
Greedy, Sorting, Implementation, Brute force
Solved
No attempts yet

Problem

Bareum keeps to the plans written in his diary every day and leads a well-ordered life. Today he is planning tomorrow's schedule.

Bareum has a lot to do, such as study sessions, live lectures, and club activities, so some time is already taken up by these fixed commitments.

On top of that, Bareum still has many other things to do, such as assignments and dating! Our job is to tell him whether the plan he made can actually be carried out.

Bareum is strong-willed and highly driven, so:

  • Once he starts a task, he must see it through to the end.
  • He can start a new task at the same moment another one ends.

Input

The first line gives the number of already fixed schedules N (1 ≤ N ≤ 11) and the number of tasks Bareum must additionally do tomorrow K (1 ≤ K ≤ 12).

Each of the next N lines gives the start time s (0 ≤ s < 1440) and end time e (s < e ≤ 1440) of one fixed schedule.

The day starts at time 0 and ends at time 1440, the schedules do not overlap, and they are given in chronological order.

The last line gives the times T1, T2, ..., TK needed to do the K tasks Bareum planned, separated by spaces.

Each task time Ti is an integer between 1 and 1440, and the sum of T1, T2, ..., TK does not exceed 1440.

Output

Print GOOD if Bareum can carry out all the tasks he planned, and BAD otherwise.

Examples2

  1. Example 1

    Input
    4 3
    0 660
    750 780
    960 1020
    1260 1440
    120 120 120
    
    Expected output
    GOOD
    
  2. Example 2

    Input
    4 3
    0 660
    750 780
    960 1021
    1260 1440
    120 120 120
    
    Expected output
    BAD